EXPERTISE & KNOWLEDGE: FAQ AND TECHNICAL BLOG
Straight answers to complex engineering questions — and field-proven insight from Austrian–Turkish panel building. Engineered in Austria. Manufactured in Turkey.
MOST ASKED QUESTIONS
How are IEC 61439-compliant control panels manufactured outside the EU?
Compliance is defined by engineering, not geography. Every assembly is design-verified under Austrian engineering supervision in Vienna and shipped with routine-test and FAT reports.
Read the full answer
How much can EPC and MEP contractors save with INTELEC panels?
Typically 30–40% compared with manufacturing in the EU — without changing the specification. Engineering control, quality assurance and documentation remain European.
Read the full answer
What are the delivery times from Turkey to Western Europe?
3–5 days standard road delivery to key European hubs, 1–3 days express. Customs clearance, insurance and export packaging are handled by INTELEC.
Read the full answer
FREQUENTLY ASKED QUESTIONS
Compliance is defined by engineering, not geography. Every assembly is design-verified under Austrian engineering supervision in Vienna and shipped with routine-test and FAT reports.
Yes — provided the documentation is right. INTELEC panels carry CE marking and a complete documentation package in English or German: schematics, declarations of conformity, and test reports aligned with EU project requirements. Our assemblies already operate in industrial, infrastructure, and public-building projects across Europe.
Yes. Send us your schematics and specification — we review them in EPLAN Electric P8, verify the layout on a digital twin of the panel, flag collisions or optimisation options, and manufacture exactly to the approved documentation. If you only have a functional specification, we engineer the panel for you.
Nothing goes to the shop floor before your approval. You receive EPLAN Electric P8 schematics, a 3D layout of the panel, parts and terminal lists, and a heat-balance check where required. All comments are resolved in documentation first — which is why assembly errors and on-site rework stay minimal.
Every panel ships with a complete handover package: EPLAN schematics, parts and terminal lists, routine-verification results and a FAT report per IEC 61439, CE declarations, and installation and maintenance documentation. Your site team receives everything needed for SAT and final acceptance.
The QA plan is managed from Vienna and executed at the Istanbul plant: incoming component inspection, in-process checks at defined hold points, and routine verification with FAT per IEC 61439. You receive photo and video reports at every stage — and can join the FAT remotely or in person.
Typically 30–40% compared with manufacturing in the EU — without changing the specification. The saving comes from Turkey’s production economics, while engineering control, quality assurance, and documentation remain European. On serial or mixed deliveries, the total project cost advantage is even higher.
Standard road delivery reaches key European hubs within 3–5 days; express options take 1–3 days. We handle export customs clearance, cargo insurance, and rigid export packaging, so panels arrive on site ready for installation and site acceptance testing (SAT).
FREQUENTLY ASKED QUESTIONS
HÄUFIG GESTELLTE FRAGEN
SIKÇA SORULAN SORULAR
DIDN'T FIND YOUR ANSWER? ASK AN ENGINEER
Send your question to the INTELEC engineering team — you will receive a reasoned answer within one business day.
The best questions are published in this knowledge base (with your permission).
ASK AN ENGINEER
TECHNICAL BLOG: ENGINEERING INSIGHTS

FEATURED · STANDARDS · 6 MIN READ
IEC 61439-1 vs IEC 61439-2: what your specification actually requires
Where the general rules end and assembly-specific verification begins — and why confusing the two standards leads either to over-specified budgets or to under-verified panels. A clear guide for EPC specifications and procurement teams.
Read the article

STANDARDS · 5 MIN READ
CE marking of control panels: declarations, directives, common mistakes
What must be in the technical file before a panel crosses an EU border.
Read the article

TESTING · 7 MIN READ
FAT for low-voltage switchgear: a practical pre-shipment checklist
The tests and documents that prevent surprises at SAT.
Read the article

PROCUREMENT · 5 MIN READ
Total cost of ownership: why the cheapest panel quote can cost you more
Logistics, rework and documentation risk in EPC procurement.
ASK AN ENGINEER